« Back to Projects

Owens & Minor Cleveland
75,000 SF



OWENS & MINOR
Cleveland, OH
75,000 Square Feet

BCCG was selected to construct the concrete tilt up warehouse building. The scope of work included standard finishes, layout and overall design.

PROJECT HIGHLIGHTS

  • 30' Clear ceiling height; 60' Speed bay
  • (14) dock positions; (1) building access ramp
  • 5,000 SF office with LED lighting and motion controls
  • 5,000 SF temperature-controlled storage room
  • ESFR fire protection system
  • T5 High bay lights with motion sensors
  • 125 KW backup generator
  • Fast-track total schedule is 11 months with land acquisitions
  • LEED Silver Accreditation

 

BCCG NEWS
eclipse icon
Bonnie Cone Classical Academy: Caution, Wet Paint!
10/17/2019

BC Construction Group is pleased to report that Bonnie Cone Classical Academy, located in Huntersville, NC, is coming together nicely. The drywall is complete and we are painting the interior. The lighting is currently being installed, and the school co
Read more

eclipselogo2
Swan Products Expansion Continues
10/07/2019

With the west addition to the existing building complete, adding 165,000 sf of warehouse space and a 4,500 sf administration area, construction is well under way for the 124,000 sf east addition. You can see in the photo, we are finishing up the roof in
Read more